Crane operation being supervised on a construction site

Lifting

Appointed Person support for lifting operations

Planning input, clear roles and a proper site briefing — so the lift is controlled by someone who understands it, and everyone on the ground knows their part.

The Appointed Person plans the lifting operation and carries responsibility for that plan: load and site assessment, equipment and accessory selection, method and sequence, role allocation and supervision arrangements. KVK provides AP input on planning and briefings where appropriately competent for the lift, and says so plainly where a lift needs a specialist we do not cover.

What this includes

Planning input

Load and site assessment, equipment and accessory selection, method and sequence for the operation.

Roles defined

Appointed Person, supervisor, slinger/signaller and operator responsibilities set out and matched to competence.

Site briefing

The plan briefed to the crew who will carry out the lift, in language they can act on at the pick.

Competence review

An honest look at cards, tickets and experience across your lifting roles, and what needs filling.

Where the role usually goes wrong

The common failure is not a bad plan — it is nobody being clearly in charge. Roles blur, the slinger assumes the supervisor has checked something, and the plan on paper does not match what happens at the pick.

We keep the roles explicit and briefed. If your team is stretched too thin to cover them properly, we will say that too.

Support now, competence later

Most clients want both: help with the lifts in front of them, and a route to holding the competence in-house. We cover the immediate operation and arrange the training that gets your own people qualified.

Where a lift needs an Appointed Person background beyond ours, we tell you before the job — not halfway through it.

FAQs

Common questions

Not sure what you need? Ask us.

Tell us the course, the site or the problem. We will come back with options, dates and a straight answer.